KfW & BAFA: how to get money for your renovation
Every year, Altbau owners leave millions in subsidies on the table — not because they're rejected, but because they apply too late, pick the wrong program, or get the sequence wrong. This guide walks you through the jungle.
Which program for which measure?
| Measure | Program | Grant |
|---|---|---|
| Windows, insulation, roof | KfW 264 (BEG) | up to 25% grant |
| Heat pump, boiler swap | BEG-EMWG (via BAFA) | up to 70% |
| Consulting / renovation roadmap | BEG-ZEB | 50–80% of fees |
| Single listed-building window | KfW 264 / state programs | variable, sometimes 40%+ |
Only work started after the grant approval counts. Signing a tradesman's contract before applying is the most common — and most expensive — own-goal in the entire subsidy jungle.
The process in five steps
- Hire an energy-efficiency expert. Every BEG application runs through a listed expert (BAFA/dena expert list). Cost: €1,300–2,500 — itself grant-eligible.
- Have a renovation roadmap drawn up. It doesn't mandate specific measures, but unlocks bonuses of up to 25% and is valid for 2 years.
- Submit via the KfW grant portal / BAFA portal. Important: start work only after grant approval.
- Execute and collect the specialist-contractor confirmation. Your tradespeople must confirm the applied-for items.
- Request disbursement — within 36 months of approval, with invoices and confirmations.
The five most common reasons for rejection
- Construction started before approval (about 40% of rejections)
- Measure doesn't meet the applied-for U-value / efficiency standard
- Missing contractor confirmation at disbursement
- Application under the wrong applicant category (landlord vs. owner-occupier bonuses)
- Budget exhausted — some pots run dry by spring. Apply early in the year!
Sources and verification
- KfW — Förderprogramme und aktuelle Programmbedingungen
- BAFA — Bundesamt für Wirtschaft und Ausfuhrkontrolle
- Gebäudeenergiegesetz (GEG)
These primary sources are starting points for verifying the framework. Rates, programmes and deadlines change; the version currently in force applies. Figures on this page are orientation only, not a quote or professional advice.
Frequently asked questions
Must the grant application be filed before work starts?
For the usual programmes, yes: the application comes before the contract is awarded and the approval before work begins. Exact cut-off dates are set in the programme terms in force at the time and do change.
Does DIY labour count as eligible cost?
Usually not. Eligible costs are normally invoices from qualified contractors, including planning; materials for own work are generally not counted. Check the current guideline before committing.
Can a grant and a tax reduction be combined?
Not normally for the same costs. Measures can often be split, but each part then has to be applied for and documented separately; double counting is excluded.
How much subsidy would your renovation deserve?
Estimate total costs first — then apply the subsidy rate on top.
Open the calculatorNote: indicative values, not legal advice. Subsidy terms change regularly — the current KfW/BAFA fact sheets are authoritative. Feedback for the editors: hello@altbau.com