Costs & Planning

Setting an Altbau renovation budget: a realistic framework

altbau.com editorial · Updated: October 2026 · 3 min read
Budget first, hammer second. Photo: Unsplash / Pexels (license-free)

Most Altbau renovations don't fail on craftsmanship — they fail on the budget being wrong from day one. The fix is not optimism; it's a structure. Here is the framework our articles use behind the numbers.

Step 1: pick the scope band honestly

ScopeIncludesCost band, per m²
CosmeticPainting, floor sanding, small repairs80–150 €
Partial+ bathroom, electrics, windows450–800 €
Full+ heating, insulation, layout changes900–1.600 €

Be honest about which band you are in. "Just a bit of painting" that quietly adds an electrics update is the classic budget killer. If the property is pre-1918, apply a 10–15% uplift — the building fabric is simply older.

Step 2: add the three reserves

  1. Discovery reserve, 10–15%. Altbau walls hide the past: old water damage, cabled-over chimneys, plaster that only looks sound. This reserve is not optional — it is the price of admission.
  2. Fit-out reserve, 5–8%. Everything visible: switches, radiators, doors, sockets. The invisible budget line everyone forgets.
  3. Time reserve. For DIY contribution, price your own hours at zero but plan the calendar at double. Living in a renovation takes longer than doing one.
The sequencing rule

Order is money: roof and damp → windows → electrics/plumbing → heating → floors → surfaces. Every step done out of order gets torn open again. Insulating after painting, or re-sanding floors after the electrician, is paying twice.

Advertisement

Step 3: know where budgets blow up

Step 4: offset with subsidies

Windows, insulation and heating measures typically fall under KfW 264 (BEG), with grants of 15% and up. Applied before contract award, a renovation roadmap can push that higher. On a partial renovation, subsidies routinely recover 10–20% of the budget.

Advertisement

Sources and verification

These primary sources are starting points for verifying the framework. Rates, programmes and deadlines change; the version currently in force applies. Figures on this page are orientation only, not a quote or professional advice.

Frequently asked questions

How much contingency should a renovation budget include?

A separate line for hidden damage makes sense, because the fabric can only be judged once it is opened. Rather than a blanket percentage, it is more reliable to review the risks trade by trade.

Why do quotes vary so widely?

Scope, preparatory work, material quality and who handles disposal or scaffolding are often defined differently. Comparison only makes sense once the line items actually match.

Which items are most often forgotten?

Scaffolding and protection, disposal of old components, making good around connections, permits and surveys, and the period during which the flat cannot be used.

Start with a number, not a feeling

Our calculator turns your scope and floor area into a realistic cost band — in 30 seconds.

Open the calculator

Cost bands are researched indicative values (October 2026) for typical German trade rates. No paid recommendations.