Measure matrix: component, cost type, trigger and grant logic
Why a matrix rather than a checklist
A checklist says what to remember. It does not say which question comes first. In period buildings almost every measure depends on three things: the type of cost (one-off, running, recurring), a trigger outside your own property (permission, local statute, tenancy law, the owners' association), and a grant logic tied to the moment the application is filed. Looking at those three columns separately reveals conflicts before they cost money.
The table below is deliberately qualitative. It contains no amounts, percentages or deadlines, because these change with federal state, programme year and property. It is a planning grid, not a grant calculator and not legal advice.
How to read the four columns
"Cost type" describes the structure of the expense: one-off building work, running consumption costs, recurring maintenance, or costs that only arise because of another measure (making good around connections, reveals, floors). "Trigger" is everything that must be settled before execution. "Grant logic" describes structure only: application before contract award, evidence from a qualified contractor, separation from other funding routes. "Sequence" names what typically has to come before this component.
| Component | Cost type | Trigger | Grant logic | Sequence |
|---|---|---|---|---|
| Moisture / external wall | Diagnosis, then consequential costs | Cause unresolved; possibly the association | No programme of its own — often a precondition | Before all finishes |
| Structural parts (joists, ceilings) | One-off, fabric-related | Structural check, monument protection, notice | Evidence from a qualified contractor | After the survey |
| Wiring | One-off + wall repair costs | Qualified electrician; possibly landlord | Rarely eligible on its own | Before floors and finishes |
| Heating system | One-off + running consumption | Heat load, noise, unit placement | Application before award; programme terms | After the envelope decision |
| Windows / reveals | One-off + made-to-measure | Statute, monument, association resolution | Application before award; evidence | After wiring, with the wall plan |
| Insulation (internal / external) | One-off + making good | Moisture balance, fire and monument issues | Application before award; component-specific | After moisture diagnosis |
| Floorboards / plasterwork / doors | Recurring maintenance | Monument where fabric is protected | Rarely eligible on its own | At the end of the chain |
| Bathroom / plumbing | One-off + consequential costs | Pipe routes, waterproofing, association | Only for a defined measure | After wiring and pipework |
| Facade / roof / balcony | One-off, common property | Resolution, monument, scaffolding, neighbours | Applicant often the association | After responsibility is settled |
Fabric and moisture
Moisture is the item most often filed in the wrong place. It is not a trade of its own but a diagnosis that blocks other decisions. Before insulation, flooring or finishes, the source has to be located — indoor climate, outer skin, ground or a pipe. A vapour-tight layer applied later to a wall that is not yet understood tends to move the damage rather than solve it.
The same applies to structural elements: joists, ceilings and stair flights concern the fabric, often need permission, and in listed buildings require an additional monument-law check. Here the survey comes before any quote, not after it.
Building services: wiring, heating, windows
Wiring has the strongest effect on sequence, because new cables open up walls and floors that were supposed to be finished. It is a safety matter, not a cosmetic one; work on fixed installations belongs to a qualified electrician. Heating and windows, by contrast, are a pair: improving the envelope changes the heat load, while replacing the plant first sizes it for the old condition.
Windows are also the classic case for local statutes. Profile, glazing bars and material may be set by monument protection, preservation statutes or design rules; in a condominium the association's resolution comes on top. The reveal has to be considered as soon as the wall is insulated, or it remains a thermal bridge.
Finishes and external areas
Floorboards, plasterwork and doors are close to the fabric even when they look cosmetic. How often a floor can be sanded depends on remaining thickness; whether plasterwork is recast or repaired is decided with the monument authority where the fabric is protected. These items sit at the end of the chain because almost every earlier measure can touch them.
Balconies, facades and roofs are frequently common property. That shifts the trigger from a personal decision to a resolution and complicates grant logic, because applicant and cost bearer may no longer be the same party.
How to use the matrix
Work through the rows in the order of the last column and mark, for each component, which of the four columns actually applies to your property. Only then does the grid become a workflow: diagnosis, responsibility, application, award, execution, evidence. If grants are part of the plan, put the application date at the beginning of that workflow, not at the end of the cost sheet.
For deeper reading, see the explainer on Sanierung, Renovierung and Modernisierung, the two worked examples and the viewing checklist. The matrix replaces no professional advice, but it prevents the most common planning gap: starting a measure before its preconditions are settled.